Free · printable · no upload required

Check a moving estimate before you sign.

Use this list to slow the paperwork down and identify questions worth resolving in writing. It is educational information, not legal advice or a guarantee of the final bill.

Scan my written estimate

Moving estimate red-flag checklist

  1. □ Mover identity

    The document names the company responsible for the move and, for interstate moves, gives identifying registration information. Confirm whether the seller is a carrier or broker.

  2. □ Estimate type

    It says binding, non-binding, or binding-not-to-exceed. Do not assume the headline total is a fixed price.

  3. □ Inventory and scope

    Rooms, boxes, bulky items, packing, stairs, elevators, long carries, shuttle service, and storage needs match what you disclosed.

  4. □ Transportation basis

    The document explains whether transportation is based on weight, cubic feet, time, distance, or a flat amount.

  5. □ Conditional charges

    Possible charges are listed with a rate or a clear way to calculate them—not just words such as “if applicable.”

  6. □ Valuation coverage

    Released-value or full-value protection is identified separately from the transportation price and insurance is not implied.

  7. □ Deposit and payment

    Deposit amount, refund terms, accepted payment methods, and what is due at pickup and delivery are written down.

  8. □ Pickup and delivery

    Dates are described as firm dates or windows, with any storage-in-transit or delay terms visible.

  9. □ Changes before loading

    The document explains how added goods or services will be documented and priced before work proceeds.

  10. □ Blank or conflicting terms

    No important field is blank, illegible, contradicted elsewhere, or dependent on a verbal promise that is absent from the paperwork.

For interstate moves

Federal requirements apply to interstate household-goods moves; local and intrastate moves may follow state rules instead. Start with the FMCSA Protect Your Move program and its explanation of written binding and non-binding estimates.